100 MW GE Frame 6B Turbine

The GE Frame 6B Core Engine has run 42,973 hours and 311 starts and has recently undergone a Major Inspection, since this inspection the engine has run only a few hours.
The purpose of this inspection was to carry out an on-site inspection & evaluation for relocation of the Gas turbine and HRSG package. Note, there is no Steam turbine or condenser included with the plant.

100 MW GE Frame 6B Turbine

The GE Frame 6B Gas Turbine has run 42,973 hours and 311 starts.
The purpose of this inspection was to carry out an on-site inspection & evaluation for
relocation of the Gas turbine and HRSG package. Note, there is no Steam turbine or
condenser included with the plant.

For detail information contact with us