Used Combined Cycle 65 MW Power Plant, 119 MW – 127 MW – 130 MW – 500 MW – 49.8 MW – 498 MW cobine cycle power plant. GE(General Electric) power plants.

Used Combined Cycle 65 MW Power Plant

  • Net Plant Output: 65 MW
  • Confirugation: 1 GTG + 1 STG + 1 HRSG
  • Fuel: Designed for Duel Fuel Combustion
  • Cooling Type: Water system
  • Net Efficiency: 49 %
  • COD: October 2003
  • Major Maintainance Cycle, hours: 48.000
  • Last Major Overhaul: September 2011
  • Total Operating Hours: 56.500
  • Operating Hours Since Major Overhaul: 8.100
  • Total start since commissioning: 1.110
  • Number starts after last inspection: 360

STEAM GENERATOR

  • Year of construction: 2002
  • Manufacturer: SFL Standard Fasel Lentjes B.V
  • Production of steam, ton / hr: 65

GAS TURBINE

  • Year of construction: 2001
  • Manufacturer: GE France
  • Capacity: 42 MW
  • Model – Type: Frame 6B – PG 6581B
  • Efficiency: 33 %

STEAM TURBINE

  • Year of construction: 2002
  • Manufacturer: Siemens NL
  • Capacity: 22 MW

GENERATOR

  • Generator GT Manufacturer: GE
  • Generator GT Manufacturer: SIEMENS

TRANSFORMER

  • Manufacturer: ABB
  • Model: 211800 / 900

For details information power plants contact with us